Belle Fourche Pipeline

PO Drawer 2360
Casper, WY   82602
307-237-9301

Family Owned and Operated Since 1957

President
H.A.'Hank' True, III

 

 

 

 In case of a Pipeline Emergency or Crude Oil Release, Please call our
 Control Center at 1-866-305-3741, toll free, 24 hrs a day.

 

 

Return to True Home Page

Wyoming System Map

North Dakota System Map

PHMSA - Pipeline Safety

View tariff schedules with Acrobat Reader

 

Copyright ©2001-2008
 by Belle Fourche Pipeline.
All rights reserved.
Updated: 06/18/12

 

 

Belle Fourche Pipeline is a liquids pipeline operator that gathers and transports crude oil in the Williston Basin of western North Dakota and the Powder River Basin of Wyoming.

 Notice to Shippers - High H2S, Effective January 9, 2013

Local Pipeline Tariffs

Index of BFPL Tariffs, May 1, 2014

F.E.R.C. 112.7.0 Belle Fourche Rules and Regs, Effective July 1, 2013

F.E.R.C. 113.5.0 Bell Creek, MT to Alzada, MT, Effective July 1, 2013

F.E.R.C. 114.3.0 Tisdale Junction to Hawk Point, WY, Effective July 1, 2013

F.E.R.C. 115.9.0 Fields in Converse, Campbell and Crook Cos., WY to Guernsey, Ft. Laramie and East Salt Creek Stations, Effective May 1, 2014.

F.E.R.C. 116.4.0 Sieler Station, MT to Baker, MT or Alexander, ND Stations, Effective July 1, 2013

F.E.R.C. 117.6.0 Billings, Golden Valley and Stark Cos., ND to Alexander, Treetop, Skunk Hill and BOE Stations, ND, Effective July 1, 2013

F.E.R.C. 119.1.0 Baker Station, Fallon County, MT to Reno Station, Johnson Co., WY and Guernsey and Ft. Laramie Stations, Platte and Goshen Cos., WY, Effective July 1, 2013.

F.E.R.C. 120.0.0 Various Truck Unload Stations, Campbell Co., WY to Guernsey and Ft Laramie Stations, Platte and Goshen Counties, WY, effective 9/1/13.

 

Wyoming General Sour Cost of Service Notifications

BFPL Rate Notification

PSC Tariff Increase Notification

 

Wyoming PSC No. 44 (Rules Tariff)

Wyoming PSC No. 53 Supplement No9. Effective 8/1/2012

Wyoming PSC No. 54 (PDF) Effective 7/19/2005

Application for Connection to Belle Fourche Pipeline

The tariffs shown here are intended to be accurate reproductions of the original FERC or PSC filings. However, should there be a discrepancy between any information found here and the original documents filed at FERC or the PSC, the originals are correct.

 

Questions?

Tad True
Vice President

Gay Browning
Scheduler

Daniel Schenk
Asst. Scheduler

Robert Stamp
Commercial Development

Phone Directory